Construction, Assembly and System Deployment of a Fish Cage with Copper Alloy Mesh Pen: Challenging Work Load and Estimation of Man-power
Yazarlar (12)
Prof. Dr. Murat Yiğit Çanakkale Onsekiz Mart Üniversitesi, Türkiye
Michael Osienski
Yabancı Kurumlar
Judson Decew
Yabancı Kurumlar
Barbaros Celikkol
Yabancı Kurumlar
Prof. Dr. Osman Sabri KESBİÇ Kastamonu Üniversitesi, Türkiye
Dr. Öğr. Üyesi Mustafa KARGA Kastamonu Üniversitesi, Türkiye
Doç. Dr. Ümit Acar Çanakkale Onsekiz Mart Üniversitesi, Türkiye
Prof. Dr. Musa Bulut Çanakkale Onsekiz Mart Üniversitesi, Türkiye
Prof. Dr. Hasan Barış Özalp Çanakkale Onsekiz Mart Üniversitesi, Türkiye
Dr. Öğr. Üyesi Ümüt Yigit Çanakkale Onsekiz Mart Üniversitesi
Nic Taylor
Robert L Dwyer
Özel Kuruluş
Makale Türü Açık Erişim Özgün Makale (Diğer hakemli uluslarası dergilerde yayınlanan tam makale)
Dergi Adı Aquatic Research
Dergi ISSN 2618-6365
Dergi Tarandığı Indeksler SciLit, FAO/AGRIS, SHERPA/RoMEO
Makale Dili İngilizce Basım Tarihi 02-2018
Cilt / Sayı / Sayfa 1 / 1 / 38–49 DOI 10.3153/AR18005
Makale Linki http://dergipark.gov.tr/download/article-file/415300
UAK Araştırma Alanları
Su Ürünleri Yetiştiriciliği
Özet
In the present study, a 150 cubic m net pen was designed as part of a collaborative research effort between the International Copper Association (ICA-USA), the University of New Hampshire (UNH-USA) and Cannakale Onsekiz Mart University (COMU-Turkey) in August 2011. The fish cage was developed to support the creation of a small scale demonstration farm, located in the Strait of Canakkale, off the coast of Guzelyali town in Turkey. The surface gravity-type, octagonal shaped fish cage was designed to have a diameter of 6 m and a copper alloy mesh chamber depth of 5 m. The present study details the cage construction and system deployment of one fish cage utilized a chain link mesh net chamber with a copper alloy developed by Wieland-Werke in Germany, with reference to work load challenge and estimation of man-power necessary for the partial and total work efforts. As a conclusion, one cage equipped with copper-alloy mesh pen was brought to a final shape with the net chamber assembled and attached to the cage frame in 3 days and 90 man-hours. The HDPE (high density polythylene) cage frame was assembled by an outside company, therefore detail of the main cage frame is not discussed in this paper.